MOP30 Lead Oxide production in Poland

In 2017 we installed the sixth MOP oxide mill, in the Exide plant in Poznan.
The first CAM mill was installed in the 2000s, until today where there are 6 CAM mills.

In this fantastic factory, AGM and flooded acid batteries of the highest level are produced, among the best in the world.
Here we have installed the new lead oxide production department, equipped with:

MOP30 oxide mill 

lead oxide storage silos

    FIRST NAME *

    LAST NAME *

    EMAIL ADDRESS *

    PHONE NUMBER

    SUBJECT

    HOW CAN WE HELP?